CESC Budge Budge down shot firing modelling and NOx reduction study
CESE has awarded a contract to SMARTLùth for NOx abetment for double down shot boiler at Budge Budge Generating Station (Unit 1 and Unit 2) to meet MOFECC Guideline. The plant capacity 2 × 250 MW PF Boilers, running with Indian Coal. Phase I, to be carried out with CFD Model to determine the NOx level and Phase II, Combustion modification.